THE CONSTRUCTION SUMMARY
ElabizProperties through Ela-G brand name, the subject project is located at West Wing Residences Eton City (WWREC) in Sta. Rosa Laguna.
ElabizProperties through Ela-G brand name, the subject project is located at West Wing Residences Eton City (WWREC) in Sta. Rosa Laguna.
Phase 1 includes the construction of the perimeter wall and a
kitchen extension on a 150 sq. meters property.
Groundworks |
Building materials utilize concrete slab on grade and
walls, metal roof truss structures to become adaptable to a roof mount solar
set-up later. Windows are specified to be dual glazed vinyl with glass. The
roof is to be composite shingle or equal with high wind exposure installations.
Plans submitted to the developer indicate the property,
which consist of the existing house; perimeter walls, the kitchen extension
perspective and plans into an aggregate total area of 150 square meters will be
developed by phase 1.
The site is relatively half-circle in shape on a corner
lot; and the property is facing two roadways that give resident un-restricted
views of the horizon.
Site development includes but not limited to earthworks
and excavations, fine grading along the existing curb and walkway, paving and
stripping, landscaping and perimeter fencing. On-grade parking will be developed as extension verandah and below will become the permanent parking slot for 2-cars and form part of phase 2 contract.
During an on-site video call with our construction contractor
engineer along with my wife Evelyn, it is decided that the frontage area of the
house, wall post, and divider wall and the washing area will be provided with decorative
tiles for ease of maintenance and added beauty. I was then skeptical for a while
because seepage of rainwater will be restricted and might be a concern but later agreed to their
suggestions.
The community is part of a residential project developed by
Eton Properties. Adjoins the site including the almost finish recreational facilities
and the multi-purpose clubhouse and a football field is being planned on the
Southwest part of the clubhouse. At the far end of the community and within
reach by the resident, a well known institutional academe breaks ground
lately.
CONSTRUCTION STATUS
Quality of construction:
Status – appears adequate and within industry standards
Construction defects – none observed
Status – appears adequate and within industry standards
Construction defects – none observed
The newly added Verandah doubled as a 2-car garage |
SITE PROTECTION
Permits – obtained related permits for car entry and personnel entry prior to the start of construction activities
Timing – construction activities only up to 5:00 PM
Accommodation – Ela-G guest house
For your construction needs E-mail; Engineer Andrew at andrewlampacan32@gmail.com (+63 9999 834 238)
Permits – obtained related permits for car entry and personnel entry prior to the start of construction activities
Timing – construction activities only up to 5:00 PM
Accommodation – Ela-G guest house
For your construction needs E-mail; Engineer Andrew at andrewlampacan32@gmail.com (+63 9999 834 238)